Handover & Commissioning

Shorten handover periods with electronic handover documentation that provides the owner with a digital asset. PDF, model-based, and more – multiple deliverable types are available through the BIM 360 platform. Capture necessary information such as equipment and component details via your iPad while in the field. This allows you to capture and report on statuses of systems and equipment which, in turn, gives insight to commissioning agents and other responsible parties.  Compile quality, safety, or commissioning checklist results for specific trades, areas of work, and/or time periods. Because of the BIM 360 platform, you are able to easily handover all of this captured information to the owner for successful facilities management through the life of the building.

The benefits?

  • Run Checklists on Any Asset – Compile quality, safety, or commissioning checklist results for specific trades, areas of work, and/or time periods.
  • Multiple  Options for Deliverable to Owner – Use commissioning information and linked documents from BIM 360 Field as the deliverable for handover and facility operations.
  • Dynamic reporting –  shows the statuses of systems and equipment, enabling commissioning agents and other responsible parties to better manage projects.

Check out how to track assets in your building here!